The management of Magnum Subsea Systems has a vast amount of experience with subsea development projects around the world particularly in the Asia Pacific region as well as India, Nigeria, and Norway. Our experiences and backgrounds cover all aspects of engineering and project management including interface management, change control, construction management, system integration management, and field support management.
Obviously, maintaining project schedule, controlling costs, providing reliable systems, and assuring safety are all vital to the success to every project and it is our commitment to provide them to our clients.
CUSTOMER |
PROJECT |
LOCATION |
SCOPE OF WORK |
YEAR |
| Schlumberger |
Intervention System |
Singapore |
Engineering Design for Intervention System |
2009 |
| WellOps |
Intervention System |
Australia |
Subsea Gate Valves |
2010 |
| JAMSTEC |
Smoker Well |
Japan |
Subsea Wellhaed, Tri‐Pod Guide Base, Casing Hanger,
Corrosion Cap |
2010 |
| MPO |
Flowspool System |
Indonesia |
Flowspool Riser Joint, H4 Connector and Direct
Hydrauic Control system |
2010 |
| JAMSTEC |
The Long Term Borehole
Monitoring System |
Japan |
Cable Clamp, Protector, Wellhead Running Tool,
Offshore Installation Services, Umbilcal Reelers |
2010 |
| eProcess |
De‐Sander System |
Australia |
Engineering Design for De‐Sander, 5 KSI System |
2010 |
| CNOOC/MSP |
Yacheng 13‐4 |
China |
Provide Technical Support for subsea tree, subsea
wellhead and control system |
2011 |
| JAMSTEC |
The Long Term Borehole
Monitoring System |
Japan |
Corrosion Cap for Subsea Wellhead |
2011 |
| JAMSTEC |
Deep Water Riser |
Japan |
FEED Study for Deep Water Drilling |
2011 |
| Apache |
Stag Water Injection |
Australia |
Subsea Tree on Mudline, Drill Through Wellhead
System and Installtion/Running Tools |
2011 |
| eProcess |
De‐Sander System |
Malaysia |
Slurry Gate Valve for De‐Sander System |
2011 |
| eProcess |
De‐Sander System |
Malaysia |
Engineering Design for De‐Sander, 10 KSI System |
2011 |
| Chevron Australia |
Gorgon /Janz |
Australia |
FEED Study For Subsea Well Intervention System |
2011 |
| JAMSTEC |
Rapid Response Drilling |
Japan |
Subsea Wellhead System for Seismic Sensors Drilling,
7,000 meters water depth |
2011 |
| Santos |
Fletcher Funicane |
Australia |
Subsea Manifolds and PLEM |
2011 |
|
 |